A designer brief should explain the property and the decisions the team needs to make. It does not need a claim about revenue improvement to be useful. Provide a measured, honest record of the existing space, intended guest activities, and practical operating constraints before discussing an aesthetic direction.
Inventories, templates and working records
Use the worksheets below with your actual property information. Download the complete plain-text worksheet
Copy and complete the design brief
A brief should let another person make a consistent decision without guessing what the owner meant. Fill in the fields below before the first scope meeting. Use measured facts and label estimates or unknowns. Keep private access details, guest records, account credentials, and sensitive owner information out of a general design pack; share only the material the actual project requires through an appropriate channel.
SHORT-TERM RENTAL DESIGN BRIEF Project name / version / date: [name / version / date] Decision owner and working contact: [person / business contact] Property type and rooms in scope: [type / room list] Measured floor plan and annotated photo folder: [document references] Fixed constraints and uncertain dimensions: [doors / windows / utilities / unknowns] Permitted guest capacity and intended activities: [separately confirmed capacity / uses] Existing items to retain, repair or remove: [inventory references] Design direction and reference images: [links / what you like about each image] Colors, finishes or themes to avoid: [specific restrictions] Essential guest functions and optional amenities: [priority list] Cleaning, laundry, storage and repair requirements: [actual operating process] Accessibility or other technical review needs: [questions / qualified reviewer] Property/building constraints to confirm: [relevant restrictions / responsible person] Total available project allowance: [actual amount / inclusions] Delivery, tax, assembly, disposal and contingency: [included / excluded / allowance] Service scope required: [design / purchasing / receiving / install / styling / photos] Target readiness date and unavailable access dates: [dates] Approval milestones and response owner: [milestones / person] Delivery route, receiving contact and storage: [survey / person / location] Substitution approval process: [who approves / what evidence is required] Required handover documents: [inventory / care / warranties / reset photos / issues] Success at acceptance: [observable tests, not a promised revenue result] Open questions and responsible owners: [question / person / due date]
Assemble the evidence behind the brief
Send a concise document index with the brief so the designer can find the relevant evidence. A reference photograph is useful when you explain whether it represents a color, material, layout, or atmosphere; it is less useful as an instruction to reproduce a room with different dimensions. Include both what you like and what should not be copied. Document existing wear and service constraints before assuming that a retained item is suitable.
| Document | Include | Question it resolves |
|---|---|---|
| Measured survey | Room dimensions, ceiling constraints, fixed fixtures, doors/windows and unresolved measurements | What can actually fit and which dimensions need confirmation? |
| Annotated photographs | Wide views plus labels for retained items, control locations and condition issues | What is present today, and what cannot be inferred from a plan? |
| Retained inventory | Size/model, condition, repair decision and approved reset use | Which purchases are unnecessary or need compatibility checks? |
| Guest-use brief | Sleeping, dining, luggage, work and activity needs for the planned capacity | Which functions take priority over optional styling? |
| Operating notes | Cleaner feedback, laundry process, spare storage and repair responsibility | Can the installed design be cleaned and maintained? |
| References and restrictions | A few labeled reference images plus relevant property/building constraints | Which aesthetic choices are intentional and which need qualified review? |
| Budget sheet | Actual available funds and full installed-cost categories | Is the selection within the same stated scope? |
Compare proposals against one scope
Separate service fees from the products and third-party work. Ask who places orders, owns vendor communication, handles receiving discrepancies, approves substitutions, and completes installation. A proposal can appear less expensive because it omits work the owner still has to pay for or perform. Do not infer return on investment from a design quote; define success through delivered scope and tested function.
| Scope line | Record in every proposal | Owner question |
|---|---|---|
| Concept and plans | Rooms, drawings, revision rounds, and approval deliverables | Which layouts and specifications become part of the final pack? |
| Product sourcing | Selection list, procurement responsibility and substitution process | Who confirms current availability and exact product identity? |
| Purchasing and receipts | Payment process, receipts, order tracking and warranty handover | Who owns the vendor relationship and records? |
| Freight and receiving | Delivery type, access limitations, storage and inspection responsibilities | Who resolves missing/damaged items under the vendor’s terms? |
| Installation | Assembly, placement, qualified work, disposal and final cleaning scope | Which tasks or specialist approvals remain outside the designer’s service? |
| Launch and handover | Reset photos, care register, commissioning trial and unresolved issues | What evidence is required before acceptance? |
| Cost changes | Actual fee/product totals, exclusions, contingency and written change approval | What can change the price and who must approve it first? |
Build dates from dependencies, not a universal duration
Ask for a schedule based on confirmed access, approval time, procurement information, room readiness, and actual delivery arrangements. Generic promises about an eight-week project or a two-day install are not a substitute for this property’s dependencies. A target date is a planning constraint until its prerequisites have been confirmed.
| Gate | Evidence needed to proceed | Record |
|---|---|---|
| Brief approved | Scope, priorities, measured facts and unresolved questions agreed | Decision owner / date / open questions |
| Plan approved | Usable layout, retained items, budget reconciliation and technical review needs identified | Version / approval / conditions |
| Order approved | Exact items, installed costs, stock and delivery scope confirmed | Quote references / substitution rules |
| Ready for delivery | Room readiness, access route, receiving contact and storage confirmed | Readiness owner / evidence / date |
| Install and test | Items reconciled, qualified work handled, full guest-use/reset trial completed | Defects / owner / completion evidence |
| Handover accepted | Care, warranty, inventory, reset photos and unresolved issues delivered | Acceptance record / follow-up plan |
Resolve unclear answers before appointing the team
Keep a written question log rather than treating a polished presentation as evidence of the whole service. Ask for examples of the relevant deliverables and how the team deals with substitutions, missed delivery dates, damaged products, and operational constraints. A response should identify scope, responsibility, and a practical next step; an unsupported promise about bookings does not answer those questions.
- Which comparable scope has the team delivered, and which evidence can be reviewed?
- What rooms, revisions, purchasing tasks, install tasks, and exclusions are in the written proposal?
- Who checks measurements and who is accountable for delivery-route confirmation?
- How are fabric care, laundry capacity, cleaner access, and replacement parts considered?
- What requires qualified technical review, and who obtains it?
- How are changes, substitutions and additional charges documented before approval?
- What communication cadence, decision log and escalation contact will the project use?
- Which final records and tests establish acceptance, and how are open issues handed over?
Make the decision from the actual setup
Include room plans, labeled photographs, retained furnishings, maintenance issues, and delivery access. Describe guest functions and the separately verified operating capacity. Set an itemized budget basis that distinguishes furnishings, freight, receiving, installation, technical work, and contingency. Label assumed prices and avoid presenting a universal cost percentage as a rule.
Define the requested deliverables and responsibilities. Specify who purchases, approves substitutions, receives deliveries, arranges trades, performs laundry, and signs off readiness. State schedule dependencies and which dates are confirmed or estimated. Provide style references with explanations rather than asking the designer to reproduce another property’s image.
Worked planning example
Illustrative scenario: Examples, prices, quantities, and timing assumptions below are hypothetical; use actual product information and local quotes for your property.
Hypothetical brief: the owner retains two bed frames pending condition inspection, replaces living-room seating, and wants clear work/dining use in a compact room. Painting is handled before installation by a separate provider. The designer supplies the measured furnishing plan and product specification. Procurement and assembly responsibilities are stated explicitly so the word full service cannot conceal an omission.
Practical checklist
- Supply measured plans, labeled photos, retained-item condition, and delivery-route information.
- Describe intended guest activities and actual operating constraints without assuming market-wide performance.
- State the complete budget basis and label unconfirmed cost or timing assumptions.
- Define deliverables, exclusions, approval owners, and procurement or installation responsibilities.
- Agree on completion evidence and a handover pack that the local team can use.
Carry the decision into the handover
Keep revisions and approvals with the brief. If a constraint changes, update the scope and product decisions rather than treating the original board as still approved. At handover, compare the installed functions with the brief. Clear inputs and responsibilities make the project reviewable without promising a particular rate increase, payback period, or guest outcome.
Sources and product instructions
The sources below provide technical background. The planning examples and checklists are original. Use instructions for the exact installed product and obtain qualified review for relevant technical requirements.